REGION₹ INR · GST 33 · PUMPS · FOUNDRIES
tbiz
Create workspace
Coimbatore · Tamil Nadu

Billing and accounting software for Coimbatore

Coimbatore makes pumps, motors and castings, and sends knitwear out of Tiruppur an hour down the road. Both are costing problems before they are accounting problems: a foundry needs to know what a casting cost after rejections, and a knitwear exporter needs to know what a garment cost after four job workers touched it.

PUMPS & MOTORS · FOUNDRY · TIRUPPUR KNITWEAR · EXPORT
Casting cost · CI pump bodyRUN 0184 · 400 PIECES
ElementCostPer piece
Metal charged2,84,000.00710.00
Melting & power96,400.00241.00
Moulding & labour58,000.00145.00
Rejections (18 pcs)20,592.0051.48
Cost per good casting₹ 1,147.48

What Coimbatore businesses use it for

Foundry costing after rejections

Cost spread over good castings rather than over everything poured, which is the only figure that means anything in a foundry.

Assembly bills of material

Pump and motor assemblies with sub-assemblies, each carrying a real cost that rolls up to the finished unit.

Knitwear job work chains

Fabric to knitting, dyeing, printing and stitching, with stock staying yours at each unit and cost accumulating through the chain.

Export documentation

Engineering and garment exports with or without payment of tax, in foreign currency, matching the shipping bill.

Power and fuel in the cost

Energy booked into production cost rather than left as an overhead, which for a foundry changes the answer materially.

Shift attendance and wages

Rosters, unpaid breaks and overtime against the shift actually worked, feeding the payroll and the job cost.

Questions from Coimbatore businesses

Can tBiz cost castings after rejections?

Yes. Rejections are recorded on the production run and the cost is spread over the good castings, which is the only cost per piece worth quoting from. Spreading it over everything poured understates it every time.

Does it handle knitwear job work through several units?

Yes — fabric goes out to knitting, dyeing, printing and stitching on challans, stays your stock at each, and accumulates cost through the chain so the finished garment carries what it actually cost.

Can I include power cost in production costing?

Yes, as an overhead allocated to the run rather than absorbed into general expenses, which matters a great deal for melting and processing operations.

Does tBiz work for both the Coimbatore unit and a Tiruppur unit?

Yes, as branches of one company or as separate companies depending on how you are registered, with their own stock, costs and reporting in either case.

Nearby and related

Cost one run properly

Start free, record a production run with its rejections, and get a cost per good piece.